KoreanEnglish

2015

Cameron LNG Liquefaction Project

Cryeng Group awarded the contract to design and manufacture Pipe In Pipe (PIP) system and ethylene bullets by EPC contractor CB&I Inc. & Chiyoda Int. Corp.(CCJV). It is strictly in accordance to the requirements of customer.

Freeport LNG Liquefaction Project

Cryeng Group awarded the contract to design and manufacture the VIP by EPC contractor CB&I Inc. & Zachry Industrial Inc. Joint Venture (CZJV) for furnishing all materials, Documentation and/ or services to furnish Vacuum Insulated Pipe.

Mineral Resources – Mini LNG Plant

Cryeng Group has fabricated the design and manufactured of LNG storage tanks, LNG road trailer, Ambient Air Vaporisers(AAV), Control and process system for Mineral Resources mini LNG plant project. It is compliance with AS1210, AS3961, AS2809, AS4458, ADG, NHVAS and any other applicable Australian Standards and licensing requirements to attain all regulatory approvals.

Road Tanker Prime Mover TestRoad Tanker Prime Mover Test Completed Road TankerCompleted Road Tanker

Completed LNG Storage VesselsCompleted LNG Storage Vessels LNG Storage Vessels being Transported to PortLNG Storage Vessels being Transported to Port

LNG Road Trailer Model RenderLNG Road Trailer Model Render AAV PackageAAV Package

ConocoPhillips, DLNG Sampler

Cryeng Group has completed the design and manufacture of a LNG sampler of shutdown construction and installation of Vacuum Jacket Piping for Conoco Phillips’s DLNG facility. The sampler has been designed for replacing LNG sampler consist of DN50 and DN100 Vacuum Insulated Pipe(VIP) branches connected on to the existing DN750 VIP pipe spool. Double block, fast loop arrangement and probes are installed also flare header tie-in pipework. It is compliance with ASME B31.3 – 2008 through all stages of design, installation testing and adhere all site health, safety and environmental requirements.

 LNG Sampler ModelLNG Sampler Model  Installation of LNG SamplerInstallation of LNG Sampler

The branch lines performed analysis of DN50 and DN100 LNG sampler braches lines located on the DLNG loading line. The finite element analysis(FEA) is being carried out to include analysis of the pipe support frictional loads on the branch lines in addition to the expansion joint loads.